ITAC Assessment: MS0450
ITAC logo
ITAC Assessment: MS0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Heavy Capacity Scales
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3596: Scales and Balances, Except Laboratory
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 400
units
Production Hrs. Annual 4,420
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,512 1,624,200
kWh
Electricity Demand $10,370 5,058
kW-mo/yr
Electricity Fees $14,950 -
Natural Gas $29,625 5,419
MMBtu
Waste Disposal Costs
Water Usage $4,381 502
Tgal
Water Disposal $4,381 280
Tgal
TOTAL YEARLY COSTS $221,219
RECOMMENDED SAVINGS* $89,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Personnel Changes Savings
01 2.7229: Air condition only space necessary $16,450 $19,723 $(-63.6)
(-655)
kWh
$16,514
-
MMBtu
- -
02 2.4322: Use or replace with energy efficient substitutes $44,435 $122,808 $44,435
458,096
kWh
- - -
03 4.514: Re-arrange equipment layout to reduce handling costs $9,485 - - - $9,485
-
MMBtu
-
04 4.515: Install shelves / racks to utilize unused space $14,625 $43,769 - - - $14,625
05 2.4226: Use / purchase optimum sized compressor $1,199 $5,414 $1,199
12,360
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,775 $1,740 $3,775
38,913
kWh
- - -
TOTAL RECOMMENDED $89,969 $193,453 $49,345
508,714
kWh
$16,514
-
MMBtu
$9,485
-
MMBtu
$14,625
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs