ITAC Assessment: UU0050
ITAC logo
ITAC Assessment: UU0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product aircraft parts
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3720:
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 253,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,919 2,016,040
kWh
Electricity Demand $66,955 7,644
kW-mo/yr
Electricity Fees $12,535 -
Natural Gas $58,727 12,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,216 $5,500 $2,834
93,100
kWh
$2,382
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,838 $2,000 - - - $5,838
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,640 $4,342 - - - $1,640
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,075 $420 $583
19,159
kWh
$492
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $177 $390 - - - $177
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,400 - - $6,400
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,684 $895 $914
30,099
kWh
$770
-
kW-mo/yr
- -
08 2.3212: Optimize plant power factor $5,144 $9,200 - - $5,144 -
TOTAL RECOMMENDED $27,174 $22,747 $4,331
142,358
kWh
$10,044
-
kW-mo/yr
$5,144 $7,655
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs