ITAC Assessment: MS0447
ITAC logo
ITAC Assessment: MS0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic Pour Bottles
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 5047: Medical, Dental, and Hospital Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 1,000,000
ft2
Annual Production 70,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,359,463 50,544,648
kWh
Electricity Demand $990,211 86,825
kW-mo/yr
Electricity Fees $(-101,782.2) -
Natural Gas $1,464,164 321,981
MMBtu
TOTAL YEARLY COSTS $4,712,055
RECOMMENDED SAVINGS* $3,527,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $668,474 $6,707,386 $452,100
9,619,143
kWh
$216,374
-
kW-mo/yr
- -
02 2.4321: Upgrade obsolete equipment $80,000 $30,005 - - - $80,000
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $56,915 $6,958 $56,915
1,210,957
kWh
- - -
04 2.1221: Replace obsolete burners with more efficient ones $43,724 $145,930 - - $43,724
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $144,047 $116,128 $144,047
3,064,830
kWh
- - -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,534,726 $11,184,200 $2,359,463
50,544,648
kWh
$990,211
-
kW-mo/yr
$(-814,947.9)
-
MMBtu
-
TOTAL RECOMMENDED $3,527,886 $18,190,608 $3,012,525
64,439,577
kWh
$1,206,585
-
kW-mo/yr
$(-771,224.2)
-
MMBtu
$80,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs