ITAC Assessment: MS0449
ITAC logo
ITAC Assessment: MS0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical Cabinets
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 200,000
ft2
Annual Production 400,000
units
Production Hrs. Annual 2,184
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,987 1,874,600
kWh
Electricity Demand $36,066 8,088
kW-mo/yr
Natural Gas $67,114 20,200
MMBtu
LPG $29,053 914
MMBtu
Waste Disposal Costs
Water Usage $5,418 4,590
Tgal
Water Disposal $8,071 1
Tgal
TOTAL YEARLY COSTS $368,709
RECOMMENDED SAVINGS* $101,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7495: Install replacement doors $13,143 $8,336 - - $13,143
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $5,389 $435
36,599
kWh
$75
-
kW-mo/yr
- - - -
03 2.4321: Upgrade obsolete equipment $10,000 $11,872 - - - - - $10,000
04 2.7229: Air condition only space necessary $11,235 $15,450 - - $11,235
-
MMBtu
- - -
05 3.5311: Recover and reuse waste material $24,000 $14,060 - - - - $24,000
-
lb
-
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $21,369 $10,437 $21,369
179,649
kWh
- - - - -
07 2.1321: Replace fossil fuel equipment with electrical equipment $21,695 $150,000 $(-7,358.4)
(-52,560)
kWh
- - $29,053
-
MMBtu
- -
TOTAL RECOMMENDED $101,952 $215,545 $14,446
163,688
kWh
$75
-
kW-mo/yr
$24,377
-
MMBtu
$29,053
-
MMBtu
$24,000
-
lb
$10,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs