ITAC Assessment: OR0131
ITAC logo
ITAC Assessment: OR0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLYWOOD SIDING
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 42,800
thousand feet
Production Hrs. Annual 5,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,718 5,788,687
kWh
Wood $218,400 320,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,465 - $1,465
35,463
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,408 $500 - $6,408
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $6,517 $1,000 $6,517
198,710
kWh
- -
04 2.6232: Install set-back timers $9,083 - $7,052
215,123
kWh
- $2,031
05 2.2511: Insulate bare equipment $1,320 $1,914 - $1,320
-
MMBtu
-
06 2.2511: Insulate bare equipment $2,749 $4,500 - $2,749
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $922 $1,763 $922
22,274
kWh
- -
08 2.5123: Reduce fluid flow rates $4,213 $7,624 $4,213
128,664
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,150 $7,200 $2,150
50,117
kWh
- -
TOTAL RECOMMENDED $34,827 $24,501 $22,319
650,351
kWh
$10,477
-
MMBtu
$2,031
TOTAL IMPLEMENTED $34,827 $24,501 $22,319
650,351
kWh
$10,477
-
MMBtu
$2,031
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs