Assessment Year | 1991 |
---|---|
Principal Product | PLYWOOD SIDING |
NAICS |
n/a
|
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 42,800
thousand feet
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $231,718 | 5,788,687 |
kWh
|
$0.040 |
Wood | $218,400 | 320,320 |
MMBtu
|
$0.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,465 | - |
$1,465
35,463
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,408 | $500 | - |
$6,408
-
MMBtu
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $6,517 | $1,000 |
$6,517
198,710
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $9,083 | - |
$7,052
215,123
kWh
|
- | $2,031 | |
05 | 2.2511: Insulate bare equipment | $1,320 | $1,914 | - |
$1,320
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $2,749 | $4,500 | - |
$2,749
-
MMBtu
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $922 | $1,763 |
$922
22,274
kWh
|
- | - | |
08 | 2.5123: Reduce fluid flow rates | $4,213 | $7,624 |
$4,213
128,664
kWh
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,150 | $7,200 |
$2,150
50,117
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,827 | $24,501 |
$22,319
650,351
kWh
|
$10,477
-
MMBtu
|
$2,031 | ||
TOTAL IMPLEMENTED | $34,827 | $24,501 |
$22,319
650,351
kWh
|
$10,477
-
MMBtu
|
$2,031 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs