Assessment Year | 2025 |
---|---|
Principal Product | Military Vehicles |
NAICS | 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $50 M to 100M |
# of Employees | 166 |
Plant Area |
650,000
ft2
|
Annual Production | 166
units
|
Production Hrs. Annual | 2,128
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $490,178 | 3,559,300 |
kWh
|
$0.14 | |
Electricity Demand | $219,101 | 13,738 |
kW-mo/yr
|
$15.95 | |
Electricity Fees | $23,433 | - |
|
- | |
Natural Gas | $53,715 | 10,965 |
MMBtu
|
$4.90 | |
LPG | $34,082 | 1,072 |
MMBtu
|
$31.80 | |
Other Gas | $9,847 | 468 |
MMBtu
|
$21.04 | |
Waste Disposal Costs | |||||
Water Usage | $5,956 | 1,677 |
Tgal
|
$3.55 | |
Water Disposal | $5,490 | 1,677 |
Tgal
|
$3.27 | |
TOTAL YEARLY COSTS | $841,800 | ||||
RECOMMENDED SAVINGS* | $324,237 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $217,439 | $973,557 |
$188,649
1,370,000
kWh
|
$28,790
-
kW-mo/yr
|
- | - | - | |
02 | 2.7229: Air condition only space necessary | $48,357 | $35,751 |
$(-158.1)
(-1,129)
kWh
|
- |
$48,515
-
MMBtu
|
- | - | |
03 | 2.7495: Install replacement doors | $10,741 | $15,697 | - | - |
$10,741
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,225 | $34,284 |
$14,643
104,595
kWh
|
$582
-
kW-mo/yr
|
- | - | - | |
05 | 2.1321: Replace fossil fuel equipment with electrical equipment | $24,271 | $200,000 |
$(-9,811.2)
(-70,080)
kWh
|
- | - |
$34,082
-
MMBtu
|
- | |
06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,205 | $72,000 |
$(-1,641.8)
(-11,727)
kWh
|
- | - | - |
$9,847
-
MMBtu
|
|
TOTAL RECOMMENDED | $324,237 | $1,331,288 |
$191,681
1,391,659
kWh
|
$29,372
-
kW-mo/yr
|
$59,256
-
MMBtu
|
$34,082
-
MMBtu
|
$9,847
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs