ITAC Assessment: MS0448
ITAC logo
ITAC Assessment: MS0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Military Vehicles
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 166
Plant Area 650,000
ft2
Annual Production 166
units
Production Hrs. Annual 2,128
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,178 3,559,300
kWh
Electricity Demand $219,101 13,738
kW-mo/yr
Electricity Fees $23,433 -
Natural Gas $53,715 10,965
MMBtu
LPG $34,082 1,072
MMBtu
Other Gas $9,847 468
MMBtu
Waste Disposal Costs
Water Usage $5,956 1,677
Tgal
Water Disposal $5,490 1,677
Tgal
TOTAL YEARLY COSTS $841,800
RECOMMENDED SAVINGS* $324,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Gas Savings
01 2.9114: Use solar heat to make electricty $217,439 $973,557 $188,649
1,370,000
kWh
$28,790
-
kW-mo/yr
- - -
02 2.7229: Air condition only space necessary $48,357 $35,751 $(-158.1)
(-1,129)
kWh
- $48,515
-
MMBtu
- -
03 2.7495: Install replacement doors $10,741 $15,697 - - $10,741
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,225 $34,284 $14,643
104,595
kWh
$582
-
kW-mo/yr
- - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $24,271 $200,000 $(-9,811.2)
(-70,080)
kWh
- - $34,082
-
MMBtu
-
06 2.1321: Replace fossil fuel equipment with electrical equipment $8,205 $72,000 $(-1,641.8)
(-11,727)
kWh
- - - $9,847
-
MMBtu
TOTAL RECOMMENDED $324,237 $1,331,288 $191,681
1,391,659
kWh
$29,372
-
kW-mo/yr
$59,256
-
MMBtu
$34,082
-
MMBtu
$9,847
-
MMBtu
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs