Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal cutting types
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0281 #06 Y:1999 Minimize water usage $1,290 $105
ME0281 #05 Y:1999 Utilize a central coolant system for cleaning and reuse of metal working fluid $80,452 $92,000
ME0281 #04 Y:1999 Install compressor air intakes in coolest locations $2,277 $300
ME0281 #03 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $2,461 $50
ME0281 #02 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $5,085 $3,826
ME0281 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $30,872 $44,461
ME0265 #13 Y:1999 Purchase equipment instead of leasing $1,171 -
ME0265 #12 Y:1999 Pay bills on time to avoid late fees $331 -
ME0265 #11 Y:1999 Apply for tax-free status for energy purchases $2,970 -
ME0265 #10 Y:1999 Pay bills on time to avoid late fees $1,304 -
ME0265 #09 Y:1999 Install compressor air intakes in coolest locations $1,397 $220
ME0265 #08 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $1,720 $1,075
ME0265 #07 Y:1999 Insulate bare equipment $2,916 $2,916
ME0265 #06 Y:1999 Pay bills on time to avoid late fees $2,388 -
ME0265 #05 Y:1999 Recover waste heat from equipment $3,895 $1,275
ME0265 #04 Y:1999 Utilize higher efficiency lamps and/or ballasts $6,352 $4,484
ME0265 #03 Y:1999 Use most efficient type of electric motors $6,135 $7,936
ME0265 #02 Y:1999 Apply for tax-free status for energy purchases $22,650 -
ME0265 #01 Y:1999 Add equipment/ operators to reduce production bottleneck $162,850 $58,000
ME0167 #04 Y:1995 Install occupancy sensors $257 $600