Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0305 #06 Y:2000 Automate finishing process $15,000 $41,800
ME0305 #05 Y:2000 Minimize water usage $325 $225
ME0305 #04 Y:2000 Install compressor air intakes in coolest locations $187 $350
ME0305 #03 Y:2000 Install / repair insulation on steam lines $366 $357
ME0305 #02 Y:2000 Utilize higher efficiency lamps and/or ballasts $396 $1,193
ME0305 #01 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $2,013 $340
ME0304 #05 Y:2000 Re-arrange equipment layout to reduce labor costs $29,835 $4,434
ME0304 #04 Y:2000 Replace city water with recycled water via cooling tower $1,848 -
ME0304 #03 Y:2000 Install / repair insulation on steam lines $152 $384
ME0304 #02 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,300 $3,542
ME0304 #01 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $1,601 $3,600
ME0303 #06 Y:2000 Add additional production shift $480,000 -
ME0303 #05 Y:2000 Change procedures / equipment / operating conditions $184,216 $324,000
ME0303 #04 Y:2000 Burn wood by-products for heat $631,036 $1,864,500
ME0303 #03 Y:2000 Use photocell controls $11,195 $4,080
ME0303 #02 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $49,880 $44,850
ME0303 #01 Y:2000 Optimize plant power factor $252,792 $97,800
ME0302 #05 Y:2000 Add additional production shift $1,000,000 -
ME0302 #04 Y:2000 Burn wood by-products for heat $879,619 $2,084,500
ME0302 #03 Y:2000 Utilize higher efficiency lamps and/or ballasts $4,862 $9,010