Assessment Year | 2000 |
---|---|
Principal Product | Dimensional lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
57,220
ft2
|
Annual Production | 93,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,078,743 | 13,512,603 |
kWh
|
$0.080 |
Electricity Demand | $233,884 | 29,485 |
kW-mo/yr
|
$7.93 |
Electricity Fees | $(-259,329.0) | - |
|
- |
Fuel Oil #2 | $4,498 | 941 |
MMBtu
|
$4.78 |
Wood | $967,526 | 403,136 |
MMBtu
|
$2.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,609,119 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $252,792 | $97,800 | - | - | $252,792 | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $49,880 | $44,850 |
$49,880
624,560
kWh
|
- | - | - | - | - | |
03 | 2.7134: Use photocell controls | $11,195 | $4,080 |
$11,195
140,094
kWh
|
- | - | - | - | - | |
04 | 3.6123: Burn wood by-products for heat | $631,036 | $1,864,500 |
$740,424
12,595,252
kWh
|
$96,049
-
kW-mo/yr
|
- |
$(-167,332.0)
-
MMBtu
|
$(-38,105.0) | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $184,216 | $324,000 | - | - | - |
$184,216
-
MMBtu
|
- | - | |
06 | 4.451: Add additional production shift | $480,000 | - | - | - | - | - | - | $480,000 | |
TOTAL RECOMMENDED | $1,609,119 | $2,335,230 |
$801,499
13,359,906
kWh
|
$96,049
-
kW-mo/yr
|
$252,792 |
$16,884
-
MMBtu
|
$(-38,105.0) | $480,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Wood Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs