ITAC Assessment: ME0303
ITAC logo
ITAC Assessment: ME0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Dimensional lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 57,220
ft2
Annual Production 93,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,078,743 13,512,603
kWh
Electricity Demand $233,884 29,485
kW-mo/yr
Electricity Fees $(-259,329.0) -
Fuel Oil #2 $4,498 941
MMBtu
Wood $967,526 403,136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,609,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Administrative Changes Savings Increase in Production Savings
01 2.3212: Optimize plant power factor $252,792 $97,800 - - $252,792 - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,880 $44,850 $49,880
624,560
kWh
- - - - -
03 2.7134: Use photocell controls $11,195 $4,080 $11,195
140,094
kWh
- - - - -
04 3.6123: Burn wood by-products for heat $631,036 $1,864,500 $740,424
12,595,252
kWh
$96,049
-
kW-mo/yr
- $(-167,332.0)
-
MMBtu
$(-38,105.0) -
05 3.1191: Change procedures / equipment / operating conditions $184,216 $324,000 - - - $184,216
-
MMBtu
- -
06 4.451: Add additional production shift $480,000 - - - - - - $480,000
TOTAL RECOMMENDED $1,609,119 $2,335,230 $801,499
13,359,906
kWh
$96,049
-
kW-mo/yr
$252,792 $16,884
-
MMBtu
$(-38,105.0) $480,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs