ITAC Assessment: MZ0056
ITAC logo
ITAC Assessment: MZ0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Cold and hot filled beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 270,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 7,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $740,785 13,801,828
kWh
Electricity Demand $61,600 14,843
kW-mo/yr
Natural Gas $600,000 110,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $6,032 $1,160 $5,412
93,312
kWh
$620
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $4,969 $950 $4,969
85,680
kWh
- -
03 2.6218: Turn off equipment when not in use $2,784 $150 $2,784
48,000
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $3,352 $150 $3,042
47,070
kWh
$310
-
kW-mo/yr
-
05 2.6127: Maintain air filters by cleaning or replacement $2,072 $1,000 $2,072
35,735
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,900 - $3,500
60,310
kWh
$400
-
kW-mo/yr
-
07 2.7492: Use proper thickness of insulation on building envelope $1,340 $800 - - $1,340
-
MMBtu
08 2.2437: Recover waste heat from equipment $99,250 $80,000 - - $99,250
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,237 $1,300 $7,367
127,021
kWh
$870
-
kW-mo/yr
-
10 2.2113: Repair or replace steam traps $113,700 $100,000 - - $113,700
-
MMBtu
TOTAL RECOMMENDED $245,636 $185,510 $29,146
497,128
kWh
$2,200
-
kW-mo/yr
$214,290
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs