ITAC Assessment: ME0304
ITAC logo
ITAC Assessment: ME0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 15,000
ft2
Annual Production 15,000
bbl
Production Hrs. Annual 3,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,082 213,951
kWh
Electricity Demand $6,657 767
kW-mo/yr
Electricity Fees $896 -
Natural Gas $9,934 1,509
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,601 $3,600 $1,083
14,361
kWh
$781
-
kW-mo/yr
$(-263.0)
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $3,542 $1,146
15,240
kWh
$154
-
kW-mo/yr
- - - -
03 2.2136: Install / repair insulation on steam lines $152 $384 - - $152
-
MMBtu
- - -
04 3.4114: Replace city water with recycled water via cooling tower $1,848 - $(-232.0)
(-3,517)
kWh
- - $1,495
-
Tgal
- $585
-
Tgal
05 4.513: Re-arrange equipment layout to reduce labor costs $29,835 $4,434 $(-113.0)
(-1,465)
kWh
$(-52.0)
-
kW-mo/yr
- - $30,000 -
TOTAL RECOMMENDED $34,736 $11,960 $1,884
24,619
kWh
$883
-
kW-mo/yr
$(-111.0)
-
MMBtu
$1,495
-
Tgal
$30,000 $585
-
Tgal
TOTAL IMPLEMENTED $31,683 $4,434 $(-345.0)
(-4,982)
kWh
$(-52.0)
-
kW-mo/yr
- $1,495
-
Tgal
$30,000 $585
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs