ITAC Assessment: ME0302
ITAC logo
ITAC Assessment: ME0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Dimensional lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 56,603
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,009,234 12,238,863
kWh
Electricity Demand $209,428 27,026
kW-mo/yr
Electricity Fees $1,013 -
Fuel Oil #2 $17,296 3,934
MMBtu
Wood $209,785 256,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,936,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Administrative Changes Savings Increase in Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,620 $42,550 $46,620
564,478
kWh
- - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,137 $6,000 $3,848
46,600
kWh
$2,283
-
kW-mo/yr
$(-994.0)
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,862 $9,010 $3,896
47,186
kWh
$966
-
kW-mo/yr
- - - -
04 3.6123: Burn wood by-products for heat $879,619 $2,084,500 $958,703
11,626,905
kWh
$43,685
-
kW-mo/yr
- $(-106,207.0)
-
MMBtu
$(-16,562.0) -
05 4.451: Add additional production shift $1,000,000 - - - - - - $1,000,000
TOTAL RECOMMENDED $1,936,238 $2,142,060 $1,013,067
12,285,169
kWh
$46,934
-
kW-mo/yr
$(-994.0)
-
MMBtu
$(-106,207.0)
-
MMBtu
$(-16,562.0) $1,000,000
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs