Assessment Year | 2000 |
---|---|
Principal Product | Dimensional lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
56,603
ft2
|
Annual Production | 90,000
thousand feet
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,009,234 | 12,238,863 |
kWh
|
$0.082 |
Electricity Demand | $209,428 | 27,026 |
kW-mo/yr
|
$7.75 |
Electricity Fees | $1,013 | - |
|
- |
Fuel Oil #2 | $17,296 | 3,934 |
MMBtu
|
$4.40 |
Wood | $209,785 | 256,403 |
MMBtu
|
$0.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,936,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $46,620 | $42,550 |
$46,620
564,478
kWh
|
- | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,137 | $6,000 |
$3,848
46,600
kWh
|
$2,283
-
kW-mo/yr
|
$(-994.0)
-
MMBtu
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,862 | $9,010 |
$3,896
47,186
kWh
|
$966
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.6123: Burn wood by-products for heat | $879,619 | $2,084,500 |
$958,703
11,626,905
kWh
|
$43,685
-
kW-mo/yr
|
- |
$(-106,207.0)
-
MMBtu
|
$(-16,562.0) | - | |
05 | 4.451: Add additional production shift | $1,000,000 | - | - | - | - | - | - | $1,000,000 | |
TOTAL RECOMMENDED | $1,936,238 | $2,142,060 |
$1,013,067
12,285,169
kWh
|
$46,934
-
kW-mo/yr
|
$(-994.0)
-
MMBtu
|
$(-106,207.0)
-
MMBtu
|
$(-16,562.0) | $1,000,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs