ITAC Assessment: ME0305
ITAC logo
ITAC Assessment: ME0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Tools & tool handles
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 37,044
ft2
Annual Production 1,250
thousand feet
Production Hrs. Annual 2,300
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,494 820,633
kWh
Electricity Demand $24,480 4,121
kW-mo/yr
Electricity Fees $2,752 -
LPG $8,101 870
MMBtu
Fuel Oil #1 $6,529 782
MMBtu
Fuel Oil #2 $1,898 258
MMBtu
Other Energy $2,948 262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Water Consumption Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,013 $340 $2,013
21,981
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $396 $1,193 $321
3,517
kWh
$75
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $366 $357 - - $366
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $187 $350 $187
2,052
kWh
- - - -
05 3.4151: Minimize water usage $325 $225 - - - $325
-
Tgal
-
06 4.446: Automate finishing process $15,000 $41,800 - - - - $15,000
TOTAL RECOMMENDED $18,287 $44,265 $2,521
27,550
kWh
$75
-
kW-mo/yr
$366
-
MMBtu
$325
-
Tgal
$15,000
TOTAL IMPLEMENTED $18,100 $43,915 $2,334
25,498
kWh
$75
-
kW-mo/yr
$366
-
MMBtu
$325
-
Tgal
$15,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Water Consumption Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs