Assessment Year | 2000 |
---|---|
Principal Product | Tools & tool handles |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
37,044
ft2
|
Annual Production | 1,250
thousand feet
|
Production Hrs. Annual | 2,300
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,494 | 820,633 |
kWh
|
$0.092 |
Electricity Demand | $24,480 | 4,121 |
kW-mo/yr
|
$5.94 |
Electricity Fees | $2,752 | - |
|
- |
LPG | $8,101 | 870 |
MMBtu
|
$9.31 |
Fuel Oil #1 | $6,529 | 782 |
MMBtu
|
$8.35 |
Fuel Oil #2 | $1,898 | 258 |
MMBtu
|
$7.36 |
Other Energy | $2,948 | 262 |
MMBtu
|
$11.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,100 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Water Consumption Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,013 | $340 |
$2,013
21,981
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $396 | $1,193 |
$321
3,517
kWh
|
$75
-
kW-mo/yr
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $366 | $357 | - | - |
$366
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $187 | $350 |
$187
2,052
kWh
|
- | - | - | - | |
05 | 3.4151: Minimize water usage | $325 | $225 | - | - | - |
$325
-
Tgal
|
- | |
06 | 4.446: Automate finishing process | $15,000 | $41,800 | - | - | - | - | $15,000 | |
TOTAL RECOMMENDED | $18,287 | $44,265 |
$2,521
27,550
kWh
|
$75
-
kW-mo/yr
|
$366
-
MMBtu
|
$325
-
Tgal
|
$15,000 | ||
TOTAL IMPLEMENTED | $18,100 | $43,915 |
$2,334
25,498
kWh
|
$75
-
kW-mo/yr
|
$366
-
MMBtu
|
$325
-
Tgal
|
$15,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Water Consumption Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs