ITAC Assessment: OR0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Machined Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 45,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,801 1,593,853
kWh
Electricity Demand $21,696 4,114
kW-mo/yr
Electricity Fees $8,561 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $11,654 $1,000 $11,654
140,394
kWh
-
02 2.2628: Utilize a less expensive cooling method $5,751 $5,908 $5,751
64,326
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,834 $800 $3,834
42,883
kWh
-
04 2.9114: Use solar heat to make electricty $5,889 $72,131 $5,768
69,485
kWh
$121
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,528 - $4,956
55,422
kWh
$572
-
kW-mo/yr
06 2.5123: Reduce fluid flow rates $2,097 $5,600 $2,097
23,998
kWh
-
TOTAL RECOMMENDED $34,753 $85,439 $34,060
396,508
kWh
$693
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs