Assessment Year | 1991 |
---|---|
Principal Product | BREAD & CAKE PRODUCTS |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
n/a
|
Annual Production | 78,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $554,175 | 8,329,133 |
kWh
|
$0.067 |
Natural Gas | $337,433 | 78,596 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $267,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,685 | $1,000 | - |
$4,685
-
MMBtu
|
|
02 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $230,323 | $780,000 |
$299,235
3,901,231
kWh
|
$(-68,912.0)
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,633 | $440 |
$2,633
39,566
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,629 | $2,688 |
$1,629
24,619
kWh
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $10,762 | - |
$10,762
161,782
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $1,767 | $14,294 |
$1,767
26,671
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,589 | - |
$1,589
24,033
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,627 | $1,200 |
$2,627
39,566
kWh
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $3,165 | $2,000 |
$3,165
47,479
kWh
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,543 | $2,000 |
$2,543
38,101
kWh
|
- | |
11 | 2.4312: Improve lubrication practices | $1,470 | $5,122 |
$1,470
21,981
kWh
|
- | |
12 | 2.7251: Reduce air conditioning load by evaporating water from roof | $4,237 | $6,400 |
$4,237
63,599
kWh
|
- | |
TOTAL RECOMMENDED | $267,430 | $815,144 |
$331,657
4,388,628
kWh
|
$(-64,227.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs