Assessment Year | 1996 |
---|---|
Principal Product | Porous Plastics |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
22,000
ft2
|
Annual Production | 360,000
lb
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,187 | 1,563,599 |
kWh
|
$0.054 |
Electricity Demand | $111,129 | 4,854 |
kW-mo/yr
|
$22.89 |
Electricity Fees | $17,634 | - |
|
- |
Natural Gas | $15,727 | 1,777 |
MMBtu
|
$8.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $123,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $99,529 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,036 | $12,396 |
$3,289
60,375
kWh
|
$2,747
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,710 | $1,680 |
$1,710
32,239
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $950 | $400 |
$538
10,258
kWh
|
$412
-
kW-mo/yr
|
- | - | - | |
04 | 2.8112: Combine utility meters | $4,532 | $3,000 | - |
$4,532
-
kW-mo/yr
|
- | - | - | |
05 | 3.1192: Reduce scrap production | $18,269 | $1,000 | - | - | - |
$18,269
-
lb
|
- | |
06 | 3.4115: Recover and reuse cooling water | $13,438 | $2,000 |
$(-175.0)
(-3,224)
kWh
|
$(-137.0)
-
kW-mo/yr
|
$13,750
-
Tgal
|
- | - | |
07 | 2.8211: Consolidate freight shipments and/or deliveries | $78,600 | $50,000 | - | - | - | - | $78,600 | |
TOTAL RECOMMENDED | $123,535 | $70,476 |
$5,362
99,648
kWh
|
$7,554
-
kW-mo/yr
|
$13,750
-
Tgal
|
$18,269
-
lb
|
$78,600 | ||
TOTAL IMPLEMENTED | $99,529 | $53,080 |
$2,248
42,497
kWh
|
$412
-
kW-mo/yr
|
- |
$18,269
-
lb
|
$78,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs