Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0840 #03 Y:2022 Recover waste heat from equipment $2,180 $699
MA0840 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $8,849 $2,575
MA0840 #01 Y:2022 Use solar heat to make electricty $21,194 $381,355
MA0839 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $366 $2,775
MA0839 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,751 $13,391
MA0839 #02 Y:2022 Insulate glazing, walls, ceilings, and roofs $2,763 $3,268
MA0839 #01 Y:2022 Use solar heat to make electricty $88,663 $1,287,855
MA0838 #06 Y:2022 Turn off equipment when not in use $1,706 $250
MA0838 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,687 $6,969
MA0838 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $6,501 $500
MA0838 #03 Y:2022 Use or replace with energy efficient substitutes $13,385 $65,000
MA0838 #02 Y:2022 Use cooling tower or economizer to replace chiller cooling $13,878 $6,206
MA0838 #01 Y:2022 Apply for tax-free status for energy purchases $32,666 $1,500
MA0835 #05 Y:2022 Reduce the pressure of compressed air to the minimum required $4,360 $625
MA0835 #04 Y:2022 Analyze flue gas for proper air/fuel ratio $680 $750
MA0835 #03 Y:2022 Recover waste heat from equipment $18,072 $14,280
MA0835 #02 Y:2022 Use heat pump for space conditioning $2,773 $7,150
MA0835 #01 Y:2022 Use waste heat from hot flue gases to preheat $10,572 $40,722
MA0836 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $1,781 $625
MA0836 #07 Y:2022 Use heat pump for space conditioning $2,777 $7,150