Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0846 #06 Y:2022 Turn off equipment during breaks, reduce operating time $674 $3,293
MA0846 #05 Y:2022 Install occupancy sensors $1,483 $4,908
MA0846 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $6,290 $625
MA0846 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $33,534 $15,450
MA0846 #02 Y:2022 Insulate bare equipment $10,916 $5,542
MA0846 #01 Y:2022 Use solar heat to make electricty $128,459 $1,302,718
MA0845 #07 Y:2022 Turn off equipment during breaks, reduce operating time $3,762 $505
MA0845 #06 Y:2022 Insulate bare equipment $6,066 $2,910
MA0845 #05 Y:2022 Adjust vents to minimize energy use $8,349 $10,667
MA0845 #04 Y:2022 Turn off equipment during breaks, reduce operating time $10,754 $14,292
MA0845 #03 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $13,709 $182,139
MA0845 #02 Y:2022 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $26,668 $60,000
MA0845 #01 Y:2022 Use solar heat to make electricty $108,785 $906,122
MA0844 #06 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $574 $2,100
MA0844 #05 Y:2022 Insulate bare equipment $597 $895
MA0844 #04 Y:2022 Recover waste heat from equipment $853 $4,200
MA0844 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,466 $23,175
MA0844 #02 Y:2022 Optimize plant power factor $5,525 $7,135
MA0844 #01 Y:2022 Use solar heat to make electricty $9,380 $10,000
MA0843 #06 Y:2022 Use heat pump for space conditioning $602 $2,100