ITAC Assessment: MA0843
ITAC logo
ITAC Assessment: MA0843
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 13
Plant Area 50,000
ft2
Annual Production 1,168,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,172 1,415,904
kWh
Electricity Demand $51,489 3,318
kW-mo/yr
Electricity Fees $4,183 -
Fuel Oil #2 $21,221 979
MMBtu
Other Gas $6,117 131
MMBtu
Waste Disposal Costs
Water Usage $1,569 255
Tgal
Water Disposal $1,671 255
Tgal
TOTAL YEARLY COSTS $300,422
RECOMMENDED SAVINGS* $344,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $296,604 $860,419 $192,882
1,277,363
kWh
- - $103,722
02 2.4322: Use or replace with energy efficient substitutes $24,566 $213,470 $20,050
132,783
kWh
$4,516
-
kW-mo/yr
- -
03 2.7234: Use heat pump for space conditioning $11,001 $6,450 $9,620
63,711
kWh
$1,381
-
kW-mo/yr
- -
04 2.7234: Use heat pump for space conditioning $7,677 $3,875 $6,730
44,572
kWh
$947
-
kW-mo/yr
- -
05 2.7441: Replace broken windows and/or window sash $3,850 $54,864 $230
1,524
kWh
- $3,620
-
MMBtu
-
06 2.7234: Use heat pump for space conditioning $602 $2,100 $524
3,469
kWh
$78
-
kW-mo/yr
- -
TOTAL RECOMMENDED $344,300 $1,141,178 $230,036
1,523,422
kWh
$6,922
-
kW-mo/yr
$3,620
-
MMBtu
$103,722
TOTAL IMPLEMENTED $18,678 $10,325 $16,350
108,283
kWh
$2,328
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs