ITAC Assessment: CO0604
ITAC logo
ITAC Assessment: CO0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Gypsum wallboard
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $100
M
to 500
M
# of Employees 115
Plant Area 322,100
ft2
Annual Production 1,128,400
thousand feet
Production Hrs. Annual 7,176
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $767,965 20,647,200
kWh
Electricity Demand $319,233 35,208
kW-mo/yr
Electricity Fees $66,758 -
Natural Gas $7,017,199 802,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $325,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $140,220 $500,000 - - $140,220
-
MMBtu
- -
02 2.1213: Direct warmest air to combustion intake $112,000 $18,430 - - $112,000
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $27,400 $2,500 $18,260
450,600
kWh
$9,140
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,820 $310 $9,870
243,500
kWh
$4,950
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $31,080 $68,340 $21,460
529,600
kWh
$8,990
-
kW-mo/yr
- $700 $(-70.0)
TOTAL RECOMMENDED $325,520 $589,580 $49,590
1,223,700
kWh
$23,080
-
kW-mo/yr
$252,220
-
MMBtu
$700 $(-70.0)
TOTAL IMPLEMENTED $42,220 $2,810 $28,130
694,100
kWh
$14,090
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs