ITAC Assessment: MA0369
ITAC logo
ITAC Assessment: MA0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product solid state electronic packages
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 349
Plant Area 178,000
ft2
Annual Production 415,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,848 5,160,317
kWh
Electricity Demand $54,162 11,657
kW-mo/yr
Natural Gas $25,105 4,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
01 4.212: Adopt in-house material generation $21,886 $11,000 $(-2,100.0)
(-22,274)
kWh
- - - $23,986
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,735 $49,531 $11,735
170,574
kWh
- - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,903 $8,750 $12,892
322,392
kWh
- $(-7,989.0)
-
MMBtu
- -
04 3.4145: Use magnetic technology to treat water $2,500 $850 - - - $2,500
-
lb
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,541 $3,401 $1,541
38,687
kWh
- - - -
06 2.3191: Use demand controller or load shedder $919 - - $919
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $43,484 $73,532 $24,068
509,379
kWh
$919
-
kW-mo/yr
$(-7,989.0)
-
MMBtu
$2,500
-
lb
$23,986
-
lb
TOTAL IMPLEMENTED $22,805 $11,000 $(-2,100.0)
(-22,274)
kWh
$919
-
kW-mo/yr
- - $23,986
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs