Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Motion Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 180,000
ft2
Annual Production 48,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,865 3,150,914
kWh
Electricity Demand $171,701 12,966
kW-mo/yr
Electricity Fees $2,024 -
LPG $16,120 475
MMBtu
TOTAL YEARLY COSTS $464,710
RECOMMENDED SAVINGS* $32,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,270 $5,219 $5,270
60,410
kWh
- -
02 2.7229: Air condition only space necessary $7,093 $16,009 $7,093
81,534
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,256 $15,684 $5,911
67,767
kWh
$345
-
kW-mo/yr
-
04 2.1321: Replace fossil fuel equipment with electrical equipment $13,399 $125,000 $(-2,721.3)
(-31,200)
kWh
- $16,120
-
MMBtu
TOTAL RECOMMENDED $32,018 $161,912 $15,553
178,511
kWh
$345
-
kW-mo/yr
$16,120
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs