Assessment Year | 1998 |
---|---|
Principal Product | Fluid Milk, Cream, and Juice |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
35,000
ft2
|
Annual Production | 19,760
Tgal
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $149,889 | 3,923,798 |
kWh
|
$0.038 |
Electricity Demand | $32,546 | 9,468 |
kW-mo/yr
|
$3.44 |
Electricity Fees | $11,026 | - |
|
- |
Natural Gas | $55,000 | 12,791 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,935 | $14,709 |
$4,295
113,130
kWh
|
$640
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2511: Insulate bare equipment | $827 | $598 |
$186
4,982
kWh
|
- |
$641
-
MMBtu
|
- | - | - | |
03 | 2.2628: Utilize a less expensive cooling method | $16,899 | $444 |
$(-3,122.0)
(-82,063)
kWh
|
$(-227.0)
-
kW-mo/yr
|
- |
$11,449
-
Tgal
|
- |
$8,799
-
Tgal
|
|
04 | 3.4151: Minimize water usage | $322 | $448 | - | - | - | - | - |
$322
-
Tgal
|
|
05 | 3.1191: Change procedures / equipment / operating conditions | $1,147 | $280 | - | - | - | - | $1,147 | - | |
06 | 2.6124: Establish equipment maintenance schedule | $344 | - | - | - | - | - | $344 | - | |
TOTAL RECOMMENDED | $24,474 | $16,479 |
$1,359
36,049
kWh
|
$413
-
kW-mo/yr
|
$641
-
MMBtu
|
$11,449
-
Tgal
|
$1,491 |
$9,121
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs