ITAC Assessment: DS0113
ITAC logo
ITAC Assessment: DS0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fluid Milk, Cream, and Juice
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 35,000
ft2
Annual Production 19,760
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,889 3,923,798
kWh
Electricity Demand $32,546 9,468
kW-mo/yr
Electricity Fees $11,026 -
Natural Gas $55,000 12,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,935 $14,709 $4,295
113,130
kWh
$640
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $827 $598 $186
4,982
kWh
- $641
-
MMBtu
- - -
03 2.2628: Utilize a less expensive cooling method $16,899 $444 $(-3,122.0)
(-82,063)
kWh
$(-227.0)
-
kW-mo/yr
- $11,449
-
Tgal
- $8,799
-
Tgal
04 3.4151: Minimize water usage $322 $448 - - - - - $322
-
Tgal
05 3.1191: Change procedures / equipment / operating conditions $1,147 $280 - - - - $1,147 -
06 2.6124: Establish equipment maintenance schedule $344 - - - - - $344 -
TOTAL RECOMMENDED $24,474 $16,479 $1,359
36,049
kWh
$413
-
kW-mo/yr
$641
-
MMBtu
$11,449
-
Tgal
$1,491 $9,121
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs