5,692
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0720 #04 Y:2013 | 04 | 2013 | Use cooling tower or economizer to replace chiller cooling | $8,238 | $10,000 | |
| MA0720 #03 Y:2013 | 03 | 2013 | Optimize plant power factor | $10,121 | $12,390 | |
| MA0720 #02 Y:2013 | 02 | 2013 | Use computer programs to optimize hvac performance | $10,748 | $1,000 | |
| MA0720 #01 Y:2013 | 01 | 2013 | Apply for tax-free status for energy purchases | $13,659 | $200 | |
| MA0719 #10 Y:2013 | 10 | 2013 | Turn off steam / hot water lines leading to space heating units | $441 | $120 | |
| MA0719 #09 Y:2013 | 09 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,062 | $3,496 | |
| MA0719 #08 Y:2013 | 08 | 2013 | Install occupancy sensors | $3,071 | $2,520 | |
| MA0719 #07 Y:2013 | 07 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $3,886 | $7,930 | |
| MA0719 #06 Y:2013 | 06 | 2013 | Replace electrically-operated equipment with fossil fuel equipment | $4,960 | $35,750 | |
| MA0719 #05 Y:2013 | 05 | 2013 | Utilize higher efficiency lamps and/or ballasts | $5,004 | $16,584 | |
| MA0719 #04 Y:2013 | 04 | 2013 | Insulate bare equipment | $5,148 | $2,541 | |
| MA0719 #03 Y:2013 | 03 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $5,779 | $11,350 | |
| MA0719 #02 Y:2013 | 02 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $12,358 | $14,800 | |
| MA0719 #01 Y:2013 | 01 | 2013 | Reduce combustion air flow to optimum | $24,994 | $50,000 | |
| MA0718 #05 Y:2013 | 05 | 2013 | Reduce the pressure of compressed air to the minimum required | $777 | $200 | |
| MA0718 #04 Y:2013 | 04 | 2013 | Install / repair insulation on steam lines | $809 | $1,400 | |
| MA0718 #03 Y:2013 | 03 | 2013 | Utilize higher efficiency lamps and/or ballasts | $5,409 | $26,750 | |
| MA0718 #02 Y:2013 | 02 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $13,029 | $1,000 | |
| MA0718 #01 Y:2013 | 01 | 2013 | Burn wood by-products for heat | $37,299 | $200,000 | |
| MA0717 #05 Y:2013 | 05 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,679 | $4,082 |