ITAC Assessment: MA0720
ITAC logo
ITAC Assessment: MA0720
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Optic fiber cables
NAICS 335921: Fiber Optic Cable Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 123,750
ft2
Annual Production 5,040
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,286 3,744,000
kWh
Electricity Demand $100,406 8,883
kW-mo/yr
Electricity Fees $6,835 -
Natural Gas $101,948 11,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $13,659 $200 - - - $13,659
02 2.7226: Use computer programs to optimize hvac performance $10,748 $1,000 $10,748
140,865
kWh
- - -
03 2.3212: Optimize plant power factor $10,121 $12,390 - $10,121
-
kW-mo/yr
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $8,238 $10,000 $8,238
107,970
kWh
- - -
05 2.7314: Reduce ventilation air $7,186 $2,510 $2,296
30,094
kWh
- $4,890
-
MMBtu
-
06 2.6218: Turn off equipment when not in use $5,682 $500 $5,682
74,475
kWh
- - -
07 2.7314: Reduce ventilation air $4,116 $2,500 $2,192
28,733
kWh
- $1,924
-
MMBtu
-
08 2.7314: Reduce ventilation air $2,479 $6,235 $1,590
20,841
kWh
- $889
-
MMBtu
-
TOTAL RECOMMENDED $62,229 $35,335 $30,746
402,978
kWh
$10,121
-
kW-mo/yr
$7,703
-
MMBtu
$13,659
TOTAL IMPLEMENTED $46,882 $26,090 $21,178
277,568
kWh
$10,121
-
kW-mo/yr
$1,924
-
MMBtu
$13,659
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs