Assessment Year | 2013 |
---|---|
Principal Product | Optic fiber cables |
NAICS | 335921: Fiber Optic Cable Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
123,750
ft2
|
Annual Production | 5,040
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $283,286 | 3,744,000 |
kWh
|
$0.076 |
Electricity Demand | $100,406 | 8,883 |
kW-mo/yr
|
$11.30 |
Electricity Fees | $6,835 | - |
|
- |
Natural Gas | $101,948 | 11,599 |
MMBtu
|
$8.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,882 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $13,659 | $200 | - | - | - | $13,659 | |
02 | 2.7226: Use computer programs to optimize hvac performance | $10,748 | $1,000 |
$10,748
140,865
kWh
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $10,121 | $12,390 | - |
$10,121
-
kW-mo/yr
|
- | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,238 | $10,000 |
$8,238
107,970
kWh
|
- | - | - | |
05 | 2.7314: Reduce ventilation air | $7,186 | $2,510 |
$2,296
30,094
kWh
|
- |
$4,890
-
MMBtu
|
- | |
06 | 2.6218: Turn off equipment when not in use | $5,682 | $500 |
$5,682
74,475
kWh
|
- | - | - | |
07 | 2.7314: Reduce ventilation air | $4,116 | $2,500 |
$2,192
28,733
kWh
|
- |
$1,924
-
MMBtu
|
- | |
08 | 2.7314: Reduce ventilation air | $2,479 | $6,235 |
$1,590
20,841
kWh
|
- |
$889
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $62,229 | $35,335 |
$30,746
402,978
kWh
|
$10,121
-
kW-mo/yr
|
$7,703
-
MMBtu
|
$13,659 | ||
TOTAL IMPLEMENTED | $46,882 | $26,090 |
$21,178
277,568
kWh
|
$10,121
-
kW-mo/yr
|
$1,924
-
MMBtu
|
$13,659 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs