ITAC Assessment: MA0718
ITAC logo
ITAC Assessment: MA0718
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Eastern white pine lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 66,300
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 3,060
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,975 4,272,784
kWh
Electricity Demand $155,900 15,127
kW-mo/yr
Electricity Fees $9,050 -
LPG $14,969 616
MMBtu
Fuel Oil #2 $45,781 1,867
MMBtu
Wood $55,479 53,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Administrative Changes Savings
01 3.6123: Burn wood by-products for heat $37,299 $200,000 - - $45,779
-
MMBtu
$(-3,480.0)
-
MMBtu
$(-5,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,029 $1,000 $13,029
151,321
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,409 $26,750 $3,995
46,395
kWh
$1,414
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $809 $1,400 - - $809
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $777 $200 $777
9,028
kWh
- - - -
TOTAL RECOMMENDED $57,323 $229,350 $17,801
206,744
kWh
$1,414
-
kW-mo/yr
$46,588
-
MMBtu
$(-3,480.0)
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $14,615 $2,600 $13,806
160,349
kWh
- $809
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs