Assessment Year | 2013 |
---|---|
Principal Product | Eastern white pine lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
66,300
ft2
|
Annual Production | 25,000
thousand feet
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $415,975 | 4,272,784 |
kWh
|
$0.097 |
Electricity Demand | $155,900 | 15,127 |
kW-mo/yr
|
$10.31 |
Electricity Fees | $9,050 | - |
|
- |
LPG | $14,969 | 616 |
MMBtu
|
$24.30 |
Fuel Oil #2 | $45,781 | 1,867 |
MMBtu
|
$24.52 |
Wood | $55,479 | 53,346 |
MMBtu
|
$1.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,323 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,615 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.6123: Burn wood by-products for heat | $37,299 | $200,000 | - | - |
$45,779
-
MMBtu
|
$(-3,480.0)
-
MMBtu
|
$(-5,000.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,029 | $1,000 |
$13,029
151,321
kWh
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,409 | $26,750 |
$3,995
46,395
kWh
|
$1,414
-
kW-mo/yr
|
- | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $809 | $1,400 | - | - |
$809
-
MMBtu
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $777 | $200 |
$777
9,028
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $57,323 | $229,350 |
$17,801
206,744
kWh
|
$1,414
-
kW-mo/yr
|
$46,588
-
MMBtu
|
$(-3,480.0)
-
MMBtu
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | $14,615 | $2,600 |
$13,806
160,349
kWh
|
- |
$809
-
MMBtu
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs