Assessment Year | 2017 |
---|---|
Principal Product | Winter care goods |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
320,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $273,306 | 5,434,200 |
kWh
|
$0.050 |
Electricity Demand | $233,949 | 13,941 |
kW-mo/yr
|
$16.78 |
TOTAL YEARLY COSTS | $507,255 | |||
RECOMMENDED SAVINGS* | $36,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,108 | $43,540 |
$15,292
304,013
kWh
|
$9,816
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $7,340 | $2,435 |
$4,471
88,877
kWh
|
$2,869
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,416 | $1,428 |
$2,140
42,547
kWh
|
$1,376
-
kW-mo/yr
|
$(-100.0) | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,067 | $925 |
$647
12,860
kWh
|
$420
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,931 | $48,328 |
$22,550
448,297
kWh
|
$14,481
-
kW-mo/yr
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $36,931 | $48,328 |
$22,550
448,297
kWh
|
$14,481
-
kW-mo/yr
|
$(-100.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs