ITAC Assessment: MZ0223
ITAC logo
ITAC Assessment: MZ0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Winter care goods
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 320,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,306 5,434,200
kWh
Electricity Demand $233,949 13,941
kW-mo/yr
TOTAL YEARLY COSTS $507,255
RECOMMENDED SAVINGS* $36,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,108 $43,540 $15,292
304,013
kWh
$9,816
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $7,340 $2,435 $4,471
88,877
kWh
$2,869
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,416 $1,428 $2,140
42,547
kWh
$1,376
-
kW-mo/yr
$(-100.0)
04 2.4221: Install compressor air intakes in coolest locations $1,067 $925 $647
12,860
kWh
$420
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,931 $48,328 $22,550
448,297
kWh
$14,481
-
kW-mo/yr
$(-100.0)
TOTAL IMPLEMENTED $36,931 $48,328 $22,550
448,297
kWh
$14,481
-
kW-mo/yr
$(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs