ITAC Assessment: MA0426
ITAC logo
ITAC Assessment: MA0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Reprocessed Textiles for Industrial Use
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 191,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,526 5,733,001
kWh
Electricity Demand $265,041 19,691
kW-mo/yr
Fuel Oil #2 $7,702 2,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.3212: Optimize plant power factor $9,368 $24,200 - $9,368
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $586 $458 $586
9,086
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $623 $25 $623
9,672
kWh
- -
04 2.7231: Use radiant heater for spot heating $902 $1,975 - - $902
-
MMBtu
05 2.7293: Install dry sprinkler system or other method to reduce heating requirements $2,320 $9,100 $1,549
24,033
kWh
$771
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,799 $35,758 $2,758
42,791
kWh
$10,139
-
kW-mo/yr
$902
-
MMBtu
TOTAL IMPLEMENTED $1,209 $483 $1,209
18,758
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs