ITAC Assessment: UL0161
ITAC logo
ITAC Assessment: UL0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Reconditioned Gasoline & Diesel Engines
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 850
Plant Area 369,000
ft2
Annual Production 68,500
pieces
Production Hrs. Annual 3,640
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,958 5,172,040
kWh
Electricity Demand $106,061 17,287
kW-mo/yr
Natural Gas $353,491 86,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings By-product Production Savings
01 2.3212: Optimize plant power factor $21,995 $21,995 - $21,995
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $659 $3,956 $436
11,137
kWh
$223
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,100 $2,100 $1,300
32,825
kWh
$800
-
kW-mo/yr
- - -
04 3.5316: Contract a wood pallet recycling company $104,000 - - - - - $104,000
05 3.1161: Eliminate/reduce an operation $3,130 $1,500 - - $3,130
-
lb
- -
06 3.1161: Eliminate/reduce an operation $6,390 - - - - $6,390
-
lb
-
TOTAL RECOMMENDED $138,274 $29,551 $1,736
43,962
kWh
$23,018
-
kW-mo/yr
$3,130
-
lb
$6,390
-
lb
$104,000
TOTAL IMPLEMENTED $21,995 $21,995 - $21,995
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs