ITAC Assessment: OR0347
ITAC logo
ITAC Assessment: OR0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Furniture
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 435,600
ft2
Annual Production 243,692
pieces
Production Hrs. Annual 5,250
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,857 12,090,563
kWh
Electricity Demand $55,233 282,852
kW-mo/yr
Electricity Fees $1,362 -
Natural Gas $271,499 86,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,971,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,959,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,755 $9,290 $9,111
242,966
kWh
$2,644
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $21,932 $6,000 $19,678
524,912
kWh
$2,254
-
kW-mo/yr
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $2,610,000 $93,000 - - - - $2,610,000
04 4.321: Optimize production lot sizes and inventories $327,800 $87,400 - - $(-4,700.0) $332,500 -
TOTAL RECOMMENDED $2,971,487 $195,690 $28,789
767,878
kWh
$4,898
-
kW-mo/yr
$(-4,700.0) $332,500 $2,610,000
TOTAL IMPLEMENTED $2,959,732 $186,400 $19,678
524,912
kWh
$2,254
-
kW-mo/yr
$(-4,700.0) $332,500 $2,610,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs