ITAC Assessment: NL0100
ITAC logo
ITAC Assessment: NL0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Healthcare
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 361,480
ft2
Annual Production 20,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,373 1,300,560
kWh
Electricity Demand $48,200 2,691
kW-mo/yr
Electricity Fees $5,329 -
Natural Gas $36,856 4,297
MMBtu
Waste Disposal Costs
Water Usage $5,948 2,548
Tgal
Water Disposal $6,630 2,548
Tgal
Other Liquid (non-haz) $634 1
gal
TOTAL YEARLY COSTS $161,970
RECOMMENDED SAVINGS* $27,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,116 $24,513 $8,646
192,606
kWh
$5,470
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $10,015 $2,350 - - - - $10,015
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,322 $16,000 $70
1,536
kWh
$269
-
kW-mo/yr
$1,983
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $516 $600 $151
3,364
kWh
$82
-
kW-mo/yr
- $283 -
05 2.7135: Install occupancy sensors $385 $2,041 $385
8,588
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $118 $227 $77
1,706
kWh
$41
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $27,472 $45,731 $9,329
207,800
kWh
$5,862
-
kW-mo/yr
$1,983
-
MMBtu
$283 $10,015
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs