ITAC Assessment: TN0581
ITAC logo
ITAC Assessment: TN0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastics Additives and Specialty Chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 39,600
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,725 6,468,054
kWh
Other Energy $188,644 39,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.5311: Recover and reuse waste material $25,995 $6,250 - - $25,995 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,270 $23,940 $20,270
506,741
kWh
- - -
03 2.7261: Install timers and/or thermostats $2,790 $1,000 $2,790
69,754
kWh
- - -
04 2.2163: Use minimum steam operating pressure $2,360 $2,600 - $2,360
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,600 - $2,600
65,064
kWh
- - -
06 2.7124: Make a practice of turning off lights when not needed $455 - $430
10,844
kWh
- - $25
TOTAL RECOMMENDED $54,470 $33,790 $26,090
652,403
kWh
$2,360
-
MMBtu
$25,995 $25
TOTAL IMPLEMENTED $455 - $430
10,844
kWh
- - $25
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs