ITAC Assessment: OK1078
ITAC logo
ITAC Assessment: OK1078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 250,000
ft2
Annual Production 42,750
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,202 6,505,045
kWh
Electricity Demand $298,349 15,539
kW-mo/yr
Electricity Fees $3,840 -
Natural Gas $164,739 48,884
MMBtu
Waste Disposal Costs
Water Usage $440,316 92,698
Tgal
TOTAL YEARLY COSTS $1,167,446
RECOMMENDED SAVINGS* $43,288 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $31,608 $540,200 $30,014
750,356
kWh
$1,594
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,663 $659 $2,663
66,576
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $5,426 $629 $3,276
81,906
kWh
$2,150
-
kW-mo/yr
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,266 $300 - - $3,266
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $325 - $133
3,325
kWh
- $192
-
MMBtu
TOTAL RECOMMENDED $43,288 $541,788 $36,086
902,163
kWh
$3,744
-
kW-mo/yr
$3,458
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs