ITAC Assessment: MA0717
ITAC logo
ITAC Assessment: MA0717
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product carbonated beverage
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 368,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,004
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $932,272 11,184,480
kWh
Electricity Demand $613,978 30,339
kW-mo/yr
Electricity Fees $2,845 -
Natural Gas $367,260 54,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $21,124 $14,700 $14,438
173,323
kWh
- $6,686
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,293 $8,275 $12,293
147,577
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $3,036 $8,700 $3,036
36,442
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,986 $5,700 $1,986
23,848
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,679 $4,082 $971
11,660
kWh
$708
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,118 $41,457 $32,724
392,850
kWh
$708
-
kW-mo/yr
$6,686
-
MMBtu
TOTAL IMPLEMENTED $15,958 $18,057 $15,250
183,085
kWh
$708
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs