Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MAS023 #06 Y:2012 Recover waste heat from equipment $1,575 $3,130
MAS023 #05 Y:2012 Use cooling tower or economizer to replace chiller cooling $3,978 $3,000
MAS023 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,899 $9,580
MAS023 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $5,970 $8,500
MAS023 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $10,502 $7,500
MAS023 #01 Y:2012 Use / purchase optimum sized compressor $10,820 $44,000
MA0691 #06 Y:2012 Reduce the pressure of compressed air to the minimum required $249 $200
MA0691 #05 Y:2012 Insulate bare equipment $772 $1,575
MA0691 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $9,115 $19,125
MA0691 #03 Y:2012 Recover waste heat from equipment $9,192 $42,500
MA0691 #02 Y:2012 Use minimum safe oven ventilation $9,618 $18,525
MA0691 #01 Y:2012 Replace boiler $9,946 $38,400
MAS022 #04 Y:2012 Reduce the pressure of compressed air to the minimum required $875 -
MAS022 #03 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,186 $4,660
MAS022 #02 Y:2012 Turn off equipment when not in use $4,821 $2,600
MAS022 #01 Y:2012 Insulate bare equipment $19,167 $20,900
MAS020 #05 Y:2012 Reduce excess steam bleeding $1,611 $500
MAS020 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $4,667 $11,600
MAS020 #03 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $11,203 $7,700
MAS020 #02 Y:2012 Use waste heat from hot flue gases to preheat $29,617 $60,000