Assessment Year | 2012 |
---|---|
Principal Product | electroplating |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 33 |
Plant Area |
30,600
ft2
|
Annual Production | 2,600,000
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,799 | 749,400 |
kWh
|
$0.096 |
Electricity Demand | $15,156 | 3,866 |
kW-mo/yr
|
$3.92 |
Electricity Fees | $2,400 | - |
|
- |
Natural Gas | $24,688 | 3,358 |
MMBtu
|
$7.35 |
Fuel Oil #2 | $16,493 | 859 |
MMBtu
|
$19.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,892 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,021 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $9,946 | $38,400 | - |
$(-6,316.0)
-
MMBtu
|
$16,262
-
MMBtu
|
|
02 | 2.2212: Use minimum safe oven ventilation | $9,618 | $18,525 | - |
$9,618
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $9,192 | $42,500 |
$(-102.0)
(-1,067)
kWh
|
$9,294
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,115 | $19,125 |
$9,115
95,147
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $772 | $1,575 | - |
$772
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $249 | $200 |
$249
2,601
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,892 | $120,325 |
$9,262
96,681
kWh
|
$13,368
-
MMBtu
|
$16,262
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,021 | $1,775 |
$249
2,601
kWh
|
$772
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs