Assessment Year | 2012 |
---|---|
Principal Product | Metal Finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 64 |
Plant Area |
140,000
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,082 | 1,200,958 |
kWh
|
$0.11 |
Electricity Demand | $21,899 | 5,587 |
kW-mo/yr
|
$3.92 |
Electricity Fees | $2,400 | - |
|
- |
Natural Gas | $255,721 | 32,634 |
MMBtu
|
$7.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,049 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $19,167 | $20,900 | - | - |
$19,167
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $4,821 | $2,600 |
$4,821
43,048
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,186 | $4,660 |
$1,818
16,230
kWh
|
$368
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $875 | - |
$824
7,358
kWh
|
$51
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $27,049 | $28,160 |
$7,463
66,636
kWh
|
$419
-
kW-mo/yr
|
$19,167
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,049 | $28,160 |
$7,463
66,636
kWh
|
$419
-
kW-mo/yr
|
$19,167
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs