ITAC Assessment: MAS022
ITAC logo
ITAC Assessment: MAS022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Metal Finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 64
Plant Area 140,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,082 1,200,958
kWh
Electricity Demand $21,899 5,587
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $255,721 32,634
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,049

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $19,167 $20,900 - - $19,167
-
MMBtu
02 2.6218: Turn off equipment when not in use $4,821 $2,600 $4,821
43,048
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,186 $4,660 $1,818
16,230
kWh
$368
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $875 - $824
7,358
kWh
$51
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,049 $28,160 $7,463
66,636
kWh
$419
-
kW-mo/yr
$19,167
-
MMBtu
TOTAL IMPLEMENTED $27,049 $28,160 $7,463
66,636
kWh
$419
-
kW-mo/yr
$19,167
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs