Assessment Year | 2014 |
---|---|
Principal Product | chemical and molten metal transportation kettles and containers |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
60,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 2,450
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,520 | 997,748 |
kWh
|
$0.11 |
Electricity Fees | $162 | - |
|
- |
Natural Gas | $145,181 | 12,324 |
MMBtu
|
$11.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,060 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $14,985 | $5,400 |
$(-211.0)
(-1,856)
kWh
|
$15,196
-
MMBtu
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $10,532 | $51,000 |
$10,532
92,565
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,592 | $1,010 | - |
$2,592
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,724 | $158 |
$1,724
15,152
kWh
|
- | - | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $1,708 | $6,552 | - |
$1,708
-
MMBtu
|
- | |
06 | 2.4235: Remove or close off unneeded compressed air lines | $1,149 | $96 |
$1,149
10,095
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $511 | $1,289 |
$511
4,493
kWh
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $473 | $438 |
$473
4,155
kWh
|
- | - | |
09 | 2.4151: Develop a repair/replace policy | $414 | $235 |
$552
4,851
kWh
|
- | $(-138.0) | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $371 | $1,411 |
$371
3,259
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,459 | $67,589 |
$15,101
132,714
kWh
|
$19,496
-
MMBtu
|
$(-138.0) | ||
TOTAL IMPLEMENTED | $19,060 | $61,954 |
$14,760
129,719
kWh
|
$4,300
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs