ITAC Assessment: MAS023
ITAC logo
ITAC Assessment: MAS023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Wire Mesh
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 371,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,921 5,252,800
kWh
Electricity Demand $54,617 15,463
kW-mo/yr
Electricity Fees $3,900 -
Natural Gas $321,759 39,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $10,820 $44,000 $10,820
106,080
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,502 $7,500 $10,502
102,960
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,970 $8,500 $5,511
54,026
kWh
$459
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,899 $9,580 $3,617
35,464
kWh
$282
-
kW-mo/yr
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $3,978 $3,000 $3,978
39,000
kWh
- -
06 2.2437: Recover waste heat from equipment $1,575 $3,130 - - $1,575
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $596 - $525
5,148
kWh
$71
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,340 $75,710 $34,953
342,678
kWh
$812
-
kW-mo/yr
$1,575
-
MMBtu
TOTAL IMPLEMENTED $31,787 $69,580 $30,975
303,678
kWh
$812
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs