Assessment Year | 2012 |
---|---|
Principal Product | Wire Mesh |
NAICS | 332618: Other Fabricated Wire Product Manufacturing |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
371,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $535,921 | 5,252,800 |
kWh
|
$0.10 |
Electricity Demand | $54,617 | 15,463 |
kW-mo/yr
|
$3.53 |
Electricity Fees | $3,900 | - |
|
- |
Natural Gas | $321,759 | 39,424 |
MMBtu
|
$8.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $10,820 | $44,000 |
$10,820
106,080
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,502 | $7,500 |
$10,502
102,960
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,970 | $8,500 |
$5,511
54,026
kWh
|
$459
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,899 | $9,580 |
$3,617
35,464
kWh
|
$282
-
kW-mo/yr
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,978 | $3,000 |
$3,978
39,000
kWh
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,575 | $3,130 | - | - |
$1,575
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $596 | - |
$525
5,148
kWh
|
$71
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $37,340 | $75,710 |
$34,953
342,678
kWh
|
$812
-
kW-mo/yr
|
$1,575
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,787 | $69,580 |
$30,975
303,678
kWh
|
$812
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs