Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0568 #06 Y:2016 Install timers on light switches in little used areas $472 $200
IA0568 #05 Y:2016 Install compressor air intakes in coolest locations $1,708 $422
IA0568 #04 Y:2016 Recover waste heat from equipment $2,316 $5,006
IA0568 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,386 $5,977
IA0568 #02 Y:2016 Use most efficient type of electric motors $3,266 $9,189
IA0568 #01 Y:2016 Revise smoke cleanup from operations $32,058 $60,740
IA0567 #05 Y:2016 Use excess cold process fluid for industrial cooling needs $1,259 $500
IA0567 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,604 $8,596
IA0567 #03 Y:2016 Install compressor air intakes in coolest locations $11,535 $1,320
IA0567 #02 Y:2016 Use / purchase optimum sized compressor $8,956 $7,888
IA0567 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $43,409 $75,175
IA0566 #07 Y:2016 Reduce the pressure of compressed air to the minimum required $592 $70
IA0566 #06 Y:2016 Analyze flue gas for proper air/fuel ratio $1,284 $1,000
IA0566 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,966 $195
IA0566 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,660 $6,945
IA0566 #03 Y:2016 Install occupancy sensors $3,889 $5,100
IA0566 #02 Y:2016 Use most efficient type of electric motors $4,279 $6,724
IA0566 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $19,976 $49,834
IA0565 #07 Y:2016 Reduce the pressure of compressed air to the minimum required $1,046 $70
IA0565 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,529 $165