Assessment Year | 2016 |
---|---|
Principal Product | Industrial and Agricultural Equipment |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 340 |
Plant Area |
166,285
ft2
|
Annual Production | 812
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,169 | 4,985,432 |
kWh
|
$0.043 |
Electricity Demand | $154,159 | 11,928 |
kW-mo/yr
|
$12.92 |
Natural Gas | $162,233 | 34,732 |
MMBtu
|
$4.67 |
TOTAL YEARLY COSTS | $530,561 | |||
RECOMMENDED SAVINGS* | $42,206 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,182 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7244: Revise smoke cleanup from operations | $32,058 | $60,740 |
$5,941
138,493
kWh
|
$2,602
-
kW-mo/yr
|
$23,515
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $3,266 | $9,189 |
$2,073
48,329
kWh
|
$1,193
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,386 | $5,977 |
$1,314
30,624
kWh
|
$1,072
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,316 | $5,006 | - | - |
$2,316
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,708 | $422 |
$1,142
26,588
kWh
|
$566
-
kW-mo/yr
|
- | |
06 | 2.7132: Install timers on light switches in little used areas | $472 | $200 |
$300
6,989
kWh
|
$172
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $42,206 | $81,534 |
$10,770
251,023
kWh
|
$5,605
-
kW-mo/yr
|
$25,831
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,182 | $76,106 |
$9,628
224,435
kWh
|
$5,039
-
kW-mo/yr
|
$23,515
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs