ITAC Assessment: IA0566
ITAC logo
ITAC Assessment: IA0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Butter
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 86,675
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,078 6,993,212
kWh
Electricity Demand $157,503 12,756
kW-mo/yr
Natural Gas $54,340 60,966
MMBtu
TOTAL YEARLY COSTS $618,921
RECOMMENDED SAVINGS* $34,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,976 $49,834 $15,479
265,954
kWh
$4,497
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $4,279 $6,724 $3,315
56,966
kWh
$964
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $3,889 $5,100 $3,889
66,857
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,660 $6,945 $1,685
28,952
kWh
$975
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,966 $195 $1,525
26,193
kWh
$441
-
kW-mo/yr
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,284 $1,000 - - $1,284
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $592 $70 $459
7,884
kWh
$133
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,646 $69,868 $26,352
452,806
kWh
$7,010
-
kW-mo/yr
$1,284
-
MMBtu
TOTAL IMPLEMENTED $34,646 $69,868 $26,352
452,806
kWh
$7,010
-
kW-mo/yr
$1,284
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs