Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

275

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0977 #05 Y:2024 Use solar heat to make electricty $72,598 $1,299,381
GT0977 #04 Y:2024 Turn off equipment during breaks, reduce operating time $6,327 $12,892
GT0977 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,128 $14,000
GT0977 #02 Y:2024 Turn off equipment when not in use $1,957 $1,500
GT0977 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $85,518 $1,850
GT0970 #06 Y:2023 Use solar heat to make electricty $70,120 $1,934,090
GT0970 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $93,953 $385,000
GT0970 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $268 $456
GT0970 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,675 $1,850
GT0970 #02 Y:2023 Install vinyl strip / high speed / air curtain doors $4,613 $75
GT0970 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $37,757 $200
GT0932 #06 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $9,678 $14,251
GT0932 #05 Y:2019 Utilize energy-efficient belts and other improved mechanisms $899 $1,117
GT0932 #04 Y:2019 Insulate bare equipment $4,768 $5,877
GT0932 #03 Y:2019 Install occupancy sensors $1,606 $1,689
GT0932 #02 Y:2019 Insulate bare equipment $495 $382
GT0932 #01 Y:2019 Repair and eliminate steam leaks $2,019 $500
GT0889 #05 Y:2011 Use closed cycle process to minimize waste water production $24,926 $6,000
GT0889 #04 Y:2011 Reduce excess steam bleeding $19,253 $45,075
GT0889 #03 Y:2011 Insulate bare equipment $4,743 $3,920