ITAC Assessment: GT0889
ITAC logo
ITAC Assessment: GT0889
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Woven Textile Sheeting and Blankets
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range greater than $500
M
# of Employees 45
Plant Area 109,010
ft2
Annual Production 75,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,640 4,659,400
kWh
Electricity Demand $45,469 12,991
kW-mo/yr
Natural Gas $634,394 103,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,925 $1,000 - - $3,925
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $14,795 $8,500 - - $14,795
-
MMBtu
- -
03 2.2511: Insulate bare equipment $4,743 $3,920 - - $4,743
-
MMBtu
- -
04 2.2162: Reduce excess steam bleeding $19,253 $45,075 - - $11,639
-
MMBtu
$2,229 $5,385
-
Tgal
05 3.4111: Use closed cycle process to minimize waste water production $24,926 $6,000 $309
(-6,240)
kWh
$(-42.0)
-
kW-mo/yr
- - $24,659
-
Tgal
TOTAL RECOMMENDED $67,642 $64,495 $309
(-6,240)
kWh
$(-42.0)
-
kW-mo/yr
$35,102
-
MMBtu
$2,229 $30,044
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs