ITAC Assessment: OK0466
ITAC logo
ITAC Assessment: OK0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Canned and bottled beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 62
Plant Area 150,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,878 2,845,545
kWh
Natural Gas $32,772 10,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $15,333 $4,387 $3,515
90,270
kWh
- $11,818
-
gal
02 2.1224: Replace boiler $7,884 $28,000 - $7,884
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $2,331 $1,800 $2,331
59,789
kWh
- -
04 2.7134: Use photocell controls $2,034 $2,240 $2,034
52,169
kWh
- -
05 2.2511: Insulate bare equipment $446 $1,178 $446
11,430
kWh
- -
TOTAL RECOMMENDED $28,028 $37,605 $8,326
213,658
kWh
$7,884
-
MMBtu
$11,818
-
gal
TOTAL IMPLEMENTED $17,813 $7,805 $5,995
153,869
kWh
- $11,818
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs