Assessment Year | 2018 |
---|---|
Principal Product | LAN Communication Cables |
NAICS | 335929: Other Communication and Energy Wire Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
300,000
ft2
|
Annual Production | 700,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,305,374 | 24,192,000 |
kWh
|
$0.054 |
Electricity Demand | $75,631 | 45,449 |
kW-mo/yr
|
$1.66 |
Electricity Fees | $28,183 | - |
|
- |
Natural Gas | $91,942 | 9,146 |
MMBtu
|
$10.05 |
TOTAL YEARLY COSTS | $1,501,130 | |||
RECOMMENDED SAVINGS* | $335,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,895 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,357 | $1,000 |
$6,058
112,188
kWh
|
$299
-
kW-mo/yr
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,677 | $2,850 |
$7,238
134,065
kWh
|
$439
-
kW-mo/yr
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $3,339 | $3,500 |
$3,120
57,783
kWh
|
$219
-
kW-mo/yr
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $298,212 | $362,400 |
$295,783
5,477,472
kWh
|
$2,429
-
kW-mo/yr
|
|
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $14,930 | $20,000 |
$12,370
229,089
kWh
|
$2,560
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,078 | $3,780 |
$1,980
36,661
kWh
|
$98
-
kW-mo/yr
|
|
07 | 2.7135: Install occupancy sensors | $913 | $2,750 |
$913
16,907
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $945 | $4,252 |
$835
15,466
kWh
|
$110
-
kW-mo/yr
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,515 | $6,962 |
$1,397
25,876
kWh
|
$118
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $335,966 | $407,494 |
$329,694
6,105,507
kWh
|
$6,272
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $10,895 | $15,994 |
$10,270
190,191
kWh
|
$625
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs