691
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BS0075 #02 Y:2016 | 02 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $513 | $502 | |
| BS0075 #01 Y:2016 | 01 | 2016 | Use most efficient type of electric motors | $6,685 | $1,464 | |
| BS0074 #09 Y:2016 | 09 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $177 | $483 | |
| BS0074 #08 Y:2016 | 08 | 2016 | Reduce the pressure of compressed air to the minimum required | $530 | $7 | |
| BS0074 #07 Y:2016 | 07 | 2016 | Reduce space conditioning during non-working hours | $199 | $14 | |
| BS0074 #06 Y:2016 | 06 | 2016 | Utilize higher efficiency lamps and/or ballasts | $600 | $2,800 | |
| BS0074 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $111 | $343 | |
| BS0074 #04 Y:2016 | 04 | 2016 | Repair or replace steam traps | $2,326 | $5,073 | |
| BS0074 #03 Y:2016 | 03 | 2016 | Replace boiler | $2,331 | $14,391 | |
| BS0074 #02 Y:2016 | 02 | 2016 | Install compressor air intakes in coolest locations | $283 | $448 | |
| BS0074 #01 Y:2016 | 01 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $249 | $117 | |
| BS0071 #05 Y:2016 | 05 | 2016 | Insulate bare equipment | $372 | $384 | |
| BS0071 #04 Y:2016 | 04 | 2016 | Install vinyl strip / high speed / air curtain doors | $765 | $2,575 | |
| BS0071 #03 Y:2016 | 03 | 2016 | Install occupancy sensors | $349 | $660 | |
| BS0071 #02 Y:2016 | 02 | 2016 | Install compressor air intakes in coolest locations | $124 | $187 | |
| BS0071 #01 Y:2016 | 01 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $1,181 | $2,633 | |
| BS0072 #08 Y:2016 | 08 | 2016 | Utilize higher efficiency lamps and/or ballasts | $284 | $1,323 | |
| BS0072 #07 Y:2016 | 07 | 2016 | Replace electrically-operated equipment with fossil fuel equipment | $2,023 | $3,260 | |
| BS0072 #06 Y:2016 | 06 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $547 | $582 | |
| BS0072 #05 Y:2016 | 05 | 2016 | Utilize controls to operate equipment only when needed | $240 | $413 |