Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

691

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0075 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $513 $502
BS0075 #01 Y:2016 Use most efficient type of electric motors $6,685 $1,464
BS0074 #09 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $177 $483
BS0074 #08 Y:2016 Reduce the pressure of compressed air to the minimum required $530 $7
BS0074 #07 Y:2016 Reduce space conditioning during non-working hours $199 $14
BS0074 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $600 $2,800
BS0074 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $111 $343
BS0074 #04 Y:2016 Repair or replace steam traps $2,326 $5,073
BS0074 #03 Y:2016 Replace boiler $2,331 $14,391
BS0074 #02 Y:2016 Install compressor air intakes in coolest locations $283 $448
BS0074 #01 Y:2016 Utilize energy-efficient belts and other improved mechanisms $249 $117
BS0071 #05 Y:2016 Insulate bare equipment $372 $384
BS0071 #04 Y:2016 Install vinyl strip / high speed / air curtain doors $765 $2,575
BS0071 #03 Y:2016 Install occupancy sensors $349 $660
BS0071 #02 Y:2016 Install compressor air intakes in coolest locations $124 $187
BS0071 #01 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,181 $2,633
BS0072 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $284 $1,323
BS0072 #07 Y:2016 Replace electrically-operated equipment with fossil fuel equipment $2,023 $3,260
BS0072 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $547 $582
BS0072 #05 Y:2016 Utilize controls to operate equipment only when needed $240 $413