ITAC Assessment: BS0072
ITAC logo
ITAC Assessment: BS0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Specialty Cut Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 83,190
ft2
Annual Production 1,650
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,363 658,783
kWh
Electricity Demand $19,725 3,597
kW-mo/yr
Electricity Fees $6,168 -
LPG $15,963 1,021
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $233 $48 $233
4,325
kWh
- - -
02 2.7135: Install occupancy sensors $56 $47 $56
1,039
kWh
- - -
03 2.8123: Pay utility bills on time $217 $63 - - - $217
04 2.4322: Use or replace with energy efficient substitutes $4,231 $15,400 $2,670
49,591
kWh
$1,561
-
kW-mo/yr
- -
05 2.6231: Utilize controls to operate equipment only when needed $240 $413 $240
4,461
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $547 $582 $547
10,162
kWh
- - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,023 $3,260 $1,488
27,640
kWh
$1,469
-
kW-mo/yr
$(-880.0)
-
MMBtu
$(-54.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $284 $1,323 $180
3,342
kWh
$104
-
kW-mo/yr
- -
TOTAL RECOMMENDED $7,831 $21,136 $5,414
100,560
kWh
$3,134
-
kW-mo/yr
$(-880.0)
-
MMBtu
$163
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs