ITAC Assessment: MZ0180
ITAC logo
ITAC Assessment: MZ0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product wood and solid surface fabrications
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 74,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 5,700
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,420 2,999,587
kWh
Electricity Demand $50,519 6,315
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,945

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,380 - $10,380
187,097
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $10,163 $10,500 $8,375
150,953
kWh
$1,788
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $772 $1,500 $592
10,678
kWh
$180
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,237 $900 $3,253
58,628
kWh
$984
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,512 $23,625 $8,064
145,350
kWh
$2,448
-
kW-mo/yr
06 2.2511: Insulate bare equipment $2,816 $3,700 $2,816
50,756
kWh
-
TOTAL RECOMMENDED $38,880 $40,225 $33,480
603,462
kWh
$5,400
-
kW-mo/yr
TOTAL IMPLEMENTED $27,945 $28,225 $24,513
441,831
kWh
$3,432
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs