Assessment Year | 2015 |
---|---|
Principal Product | wood and solid surface fabrications |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
74,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 5,700
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,420 | 2,999,587 |
kWh
|
$0.055 |
Electricity Demand | $50,519 | 6,315 |
kW-mo/yr
|
$8.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,945 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,380 | - |
$10,380
187,097
kWh
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $10,163 | $10,500 |
$8,375
150,953
kWh
|
$1,788
-
kW-mo/yr
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $772 | $1,500 |
$592
10,678
kWh
|
$180
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,237 | $900 |
$3,253
58,628
kWh
|
$984
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,512 | $23,625 |
$8,064
145,350
kWh
|
$2,448
-
kW-mo/yr
|
|
06 | 2.2511: Insulate bare equipment | $2,816 | $3,700 |
$2,816
50,756
kWh
|
- | |
TOTAL RECOMMENDED | $38,880 | $40,225 |
$33,480
603,462
kWh
|
$5,400
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $27,945 | $28,225 |
$24,513
441,831
kWh
|
$3,432
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs