Assessment Year | 2011 |
---|---|
Principal Product | Aluminum cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $100 M to 500M |
# of Employees | 215 |
Plant Area |
290,000
ft2
|
Annual Production | 3,000,000,000
pieces
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,314,852 | 40,414,021 |
kWh
|
$0.082 |
Electricity Demand | $195,417 | 59,665 |
kW-mo/yr
|
$3.28 |
Natural Gas | $1,278,095 | 200,793 |
MMBtu
|
$6.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $178,214 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $178,214 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $70,691 | $20,000 |
$8,141
99,282
kWh
|
$62,550
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $45,173 | $20,100 |
$10,384
126,637
kWh
|
$34,789
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $24,174 | $55,000 | - |
$24,174
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $17,015 | $30,000 |
$24,704
301,273
kWh
|
$(-7,689.0)
-
MMBtu
|
|
05 | 2.6218: Turn off equipment when not in use | $12,376 | $55,750 |
$12,376
150,932
kWh
|
- | |
06 | 2.4131: Size electric motors for peak operating efficiency | $8,785 | $11,650 |
$8,785
107,136
kWh
|
- | |
TOTAL RECOMMENDED | $178,214 | $192,500 |
$64,390
785,260
kWh
|
$113,824
-
MMBtu
|
||
TOTAL IMPLEMENTED | $178,214 | $192,500 |
$64,390
785,260
kWh
|
$113,824
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs