ITAC Assessment: MA0679
ITAC logo
ITAC Assessment: MA0679
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Aluminum cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 215
Plant Area 290,000
ft2
Annual Production 3,000,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,314,852 40,414,021
kWh
Electricity Demand $195,417 59,665
kW-mo/yr
Natural Gas $1,278,095 200,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $178,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $70,691 $20,000 $8,141
99,282
kWh
$62,550
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $45,173 $20,100 $10,384
126,637
kWh
$34,789
-
MMBtu
03 2.2437: Recover waste heat from equipment $24,174 $55,000 - $24,174
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,015 $30,000 $24,704
301,273
kWh
$(-7,689.0)
-
MMBtu
05 2.6218: Turn off equipment when not in use $12,376 $55,750 $12,376
150,932
kWh
-
06 2.4131: Size electric motors for peak operating efficiency $8,785 $11,650 $8,785
107,136
kWh
-
TOTAL RECOMMENDED $178,214 $192,500 $64,390
785,260
kWh
$113,824
-
MMBtu
TOTAL IMPLEMENTED $178,214 $192,500 $64,390
785,260
kWh
$113,824
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs