ITAC Assessment: OR0182
ITAC logo
ITAC Assessment: OR0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Food cans
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 150,000,000
pieces
Production Hrs. Annual 3,984
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,172 2,662,954
kWh
Natural Gas $50,301 11,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,404 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $357 - $357
10,258
kWh
- -
02 2.2437: Recover waste heat from equipment $10,185 $10,923 - $10,185
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $445 $750 $445
14,068
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $759 $1,359 $603
21,102
kWh
- $156
05 2.3212: Optimize plant power factor $1,458 $2,700 $1,458
-
kWh
- -
06 2.4133: Use most efficient type of electric motors $200 $994 $200
5,569
kWh
- -
TOTAL RECOMMENDED $13,404 $16,726 $3,063
50,997
kWh
$10,185
-
MMBtu
$156
TOTAL IMPLEMENTED $2,460 $4,444 $2,460
29,895
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs